November 19, 2026The Arrowwood Logistics development repurposed a former construction and demolition landfill in Newark, New Jersey, for a new logistics center. Kleinfelder provided geotechnical engineering, retaining wall design, and construction materials engineering and testing services to support development of the complex site.
Site Reuse Needs and Challenges
The project required balanced site grading because material could not be exported, creating substantial fills and the need for large retaining walls. The site also required landfill closure coordination, relocation of a large-diameter gas main, and a foundation approach suitable for uncontrolled fill and compressible marsh deposits.
Historic fill contained recycled concrete and asphalt, tires, timber, large concrete remnants, other construction debris, and isolated areas of contaminated soil and groundwater. Proposed grades required cuts and ground improvement across the northern building pad and approximately 20 feet of fill across the southern portion. Four retaining walls, including walls up to 40 feet high, had to accommodate settlement, groundwater, buried utilities, and global stability concerns.
Geotechnical Engineering Solutions
Kleinfelder evaluated the variable subsurface conditions and used dynamic deep compaction and localized removal and replacement to improve uncontrolled fill beneath the northern building pad. After the gas main was relocated, the original line was grouted and abandoned approximately 30 feet below final grade. Settlement monitoring confirmed stabilization of the marsh deposits beneath the southern building area before foundation construction proceeded. Kleinfelder designed basket-faced, geogrid-reinforced walls that could tolerate differential settlement and reused processed on-site recycled concrete aggregate as reinforced backfill. The design specified geogrid compatible with the aggregate’s elevated pH and incorporated pavements or a clay cap plus clean quarried facing and drainage aggregate to support landfill closure requirements. Jet grouting improved the Wall 1 subgrade, while rigid inclusions beneath part of Wall 4 addressed global stability. Kleinfelder also provided design support for roller compacted concrete pavements, and supported construction through observation and materials testing.
Project Results
The coordinated geotechnical and retaining wall approach enabled development of the landfill site while managing settlement, stability, groundwater, utility, and environmental constraints. Reusing on-site recycled concrete aggregate reduced the need to export material and supported the balanced grading strategy while providing suitable backfill for the reinforced walls.
Project Details
Location:
Newark, NJ
Owner:
Link Logistics Real Estate LLC
Images Courtesy of Link Logistics