Arrowwood Logistics Geotechnical Engineering and Construction Observation
November 19, 2026Summit Real Estate Group is developing the Wendell Commerce Center on approximately 233 acres in Wendell, North Carolina. The development of Phase 1 included site infrastructure and three tilt-up concrete warehouses totaling approximately 493,301 square feet, with future outparcel construction planned.
Reliable Data During Phased Development
The client needed reliable field data to evaluate whether earthwork, building construction, and offsite roadway improvements complied with project plans and specifications. The team also needed precise, consistent records for numerous soil test locations across a large and changing construction site.
The site’s scale and active construction conditions made manual or visual soil-test location tracking vulnerable to missed, duplicated, or incorrectly recorded points. Testing and inspection activities had to remain coordinated with mass grading, utilities, foundations, slabs, structural systems, pavement, and roadway work. Staffing and testing demands adapted as work progressed from site development into vertical construction.
Coordinated Geotechnical and Testing Services
Kleinfelder provided geotechnical services during the project’s initial stage and continued to serve as Geotechnical Engineer of Record during construction. Field personnel observed earthwork and performed density testing during grading, backfill, foundation excavation, subgrade preparation, finish grading, and paving. Technicians used GPS to capture precise coordinates for soil test points, reducing location ambiguity and linking results to specific areas of the site. The team imported location data into geographic information system software for mapping, reporting, and cross-referencing with drawings and construction progress.
Kleinfelder also provided testing and observation for concrete, masonry, structural steel, and asphalt, supported by laboratory testing and documented daily reports. For offsite roadway improvements, North Carolina Department of Transportation-certified personnel provided construction engineering and inspection services and prepared required certification reports.
Project Results
Kleinfelder supported Phase 1 site development activities and planned building construction. The GPS- and GIS-enabled workflow provided clearer test-point documentation, faster field navigation, and stronger quality-assurance records for the project team. Buildings 1A and 1B were leased by a single tenant, providing more than new 100 jobs for the local workforce.
Project Details
Location:
Wendell, NC
Owner:
Summit Development Group, LLC
Images Courtesy Brinkmann Construction