Imagine a Day Without Water

Imagine a day without water. No morning coffee, no weekend brunch with friends, no hot shower after swimming laps at the gym. It’s easy to take water for granted. Kleinfelder invites you to consider what life would be like if the tap ran dry. Water touches every part of our lives: from the fountains in our parks to the technology in our hospitals, from public safety to public works. It powers our homes, our communities, and our businesses. Water connects us all.

For decades, Kleinfelder has played a vital role in shaping water infrastructure by delivering safe, efficient, and dependable water solutions that empower communities, sustain businesses, and support everyday life. Explore our projects and see how we’re contributing to the future where water is safe and reliable for all.

Helping Achieve a More Secure Water Supply in Big Bend National Park

Big Bend National Park, Texas

The project encompasses replacing aging water mains, service lines, and valves; rehabilitating and replacing water treatment facilities and storage tanks; and installing new storage tanks and pumping systems to improve system capacity.

Resilient Long Beach Island Community Engagement and Modeling

Long Beach Island, New Jersey

Serving as lead consultant, Kleinfelder’s team of planners focused on developing critical policy and regulatory changes required to implement any selected projects, as well as the preparation of an action matrix to create a “roadmap” for resilience.

5.0 MG Murphy Drive Pump Station Tank No. 1 Rehabilitation

Arlington, Texas

Kleinfelder prepared the preliminary engineering assessment report and final design documents for the 5 MG GST rehabilitation that included recommendations associated with the interior and exterior coating systems, site improvement, tank structural members repair and replacement, and safety and security upgrades.

Pure Water San Diego Miramar Clearwell Improvements

San Diego, California

As the prime consultant, Kleinfelder provided engineering management, design, and construction support services. This highly complex, 4.5-year construction project met all major milestones on schedule and completed the last stages of startup in January 2021 – all with zero unplanned outages of service to over 600,000 customers in northern San Diego.

Ankeny Northwest Booster Station Design

Polk County, Iowa

Ankeny Northwest Booster Station pipes and grates

Veenstra & Kimm, A Kleinfelder Company worked with the city to design a station that could serve areas in both a closed system and an open system, giving it the ability to operate once a planned water tower is constructed in the area. The team successfully designed a station that will serve the city for many years.

Auto Parts Manufacturer Reverse Osmosis System

South Carolina

reverse osmosis system filters and pipes

The treatment system was designed to meet water quantity and quality requirements for the client with no interruption in the manufacturing process. To achieve this, Kleinfelder designed a system that treated the water using a reverse osmosis (RO) membrane system to achieve the required lower dissolved solids levels.

Kleinfelder Imagines a Day Without Water