Kleinfelder provided construction materials sampling and testing, materials quality assurance (QA) program management, and laboratory testing for the $1.4 billion State Route 4 (SR-4) Highway Widening and Interchanges Project. The Project covered about 20 miles of highway and roadway, broken into seven segments and nine interchanges, with work being performed concurrently on several individual contracts.
Kleinfelder developed and managed a QA program using a local team dedicated to the bypass and widening program. Leveraging Caltrans and/or AWS/NACE certified technicians, inspectors, and laboratories, we were able to work on multiple concurrent and diverse aspects of the overall program. The continuity of our team between each of the ongoing corridor contracts helped facilitate communication and coordination between our client, oversight representatives, and stakeholders. Our broad geographic coverage was a significant advantage, as we were able to use in-house staff to perform timely off-site fabrication inspection. Our flexibility and effective management of multiple phases of ongoing work allowed us to reduce or eliminate potential delays caused by unexpected changes in scope