Projects / Energy / PG&E CWA #66 Alviso Pond
PG&E CWA #66 Alviso Pond PDF Print E-mail

PG&E
Alviso, CA            


Project Description:

Pacific Gas and Electric Company plans to raise several existing electric power transmission line towers that cross very soft ground conditions in Alviso, CA. The original towers were constructed in the 1910s. As part of the tower modification project, the tower foundations may need to be upgraded to support the added mass of the modified towers. The existing tower footings are supported by timber piles of unknown length. According to PG&E, the existing timber piles are probably about 60 feet long.

Scope of Work

  • Geotechnical Consultant

Client Issues

  • Very soft ground conditions required specialized drilling equipment. A CME 850 drill rig mounted on a tracked carrier was used to access the site. Track width is 33 inches.
  • Young Bay Mud (very soft, settling clay) is 20 feet thick at the site. New piles will induce downdrag loads on the existing piles and any new deep foundations that may be added.
 

Kleinfelder In The News

 

Special Announcements

myKleinfelder Story

Learn more about the people our clients look to for the right solution every time

Kleinfelder Impact

Learn how Kleinfelder can impact your business by watching our Impact Video

Subscribe

Kleinfelder RSS Feed Kleinfelder RSS

Always get the latest Kleinfelder news by subscribing to our RSS feed

Kleinfelder Office Locations

Click here to find a Kleinfelder office location and contact information nearest you.